• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 4. Front Screed Arm -- Installation.
Figure 5. Front Screed Arm -- Installation.

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  48    49    50    51    52  53  54    55    56    57    58  
img
TM 5-3895-385-23-2
0230
Front Screed Arm Installation -- Continued.
WARNING
The front screed arm weighs 168 lb (76 kg). Use a suitable lifting device. Failure to comply may
cause injury or death to personnel.
CAUTION
Properly support the item being lifted. Failure to comply may cause damage to equipment.
1. Install screed arm (Figure 4, Item 4) and spacer along with bushing (Figure 4, Item 7), bolt (Figure 4, Item 6),
and nut (Figure 4, Item 1) onto Bituminous Material Paving Machine (BMPM).
2. Install tow point hydraulic cylinder (Figure 4, Item 2) and clevis pin (Figure 4, Item 5) to screed arm (Figure 4,
Item 4).
3. Install new cotter pin (Figure 4, Item 3) through clevis pin (Figure 4, Item 5).
0230-7


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.