TM 5-3895-385-23-2
0229
FIELD MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
END GATE BOTTOM BAR REMOVAL AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Equipment Conditions
General Mechanics Tool Kit (GMTK) (WP 0440, Vol
Screed extensions fully extended (TM 5-3895-385-
3, Item 64)
10)
Materials/Parts
Screed fully raised (TM 5-3895-385-10)
Bolt (3) (WP 0439, Vol 3, Item 91)
Engine off (TM 5-3895-385-10)
Lock washer (3) (WP 0439, Vol 3, Item 110)
BATTERY DISCONNECT switch OFF (TM 5-3895-
Personnel Required
385-10)
91L
Estimated Time to Complete Task
0.3 hr
END GATE BOTTOM BAR REMOVAL AND INSTALLATION
NOTE
End gate bottom bar removal and installation steps are the same for both sides of the Bituminous
Material Paving Machine (BMPM). Left side shown.
0229-1