• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 1. Preventive Maintenance Checks and Services (PMCS) Instructions -- Continued.
PREPARATION FOR SHIPMENT AND STORAGE

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  7    8    9    10    11  12  13    14    15    16    17  
img
. . . . . . . . .
TM 5-3895-385-23-2
0222
Table 1. Preventive Maintenance Checks and Services (PMCS) Instructions -- Continued.
ITEM TO BE
ITEM
CHECKED OR
EQUIPMENT NOT
NO.
INTERVAL
SERVICED
PROCEDURE
READY/AVAILABLE IF:
17
500 hours
Conveyor Torque
Replace conveyor torque hub oil
Class III leak is evident.
Hub
(WP 0419).
18
500 hours
Drive Torque Hub
Replace drive torque hub oil (WP
Class III leak is evident.
0421).
19
500 hours
Engine Air Filter
Replace secondary air cleaner
element (WP 0369).
20
500 hours
Hydraulic Oil
Replace hydraulic oil (WP 0280).
Class III leak is evident.
21
500 hours
Screed
Adjust screed extension upper
screed slide rail bar adjustment
(WP 0248).
22
500 hours
Engine Cooling
Replace antifreeze (WP 0367).
Class III leak is evident.
System
23
500 hours
Double Hydraulic
Replace double pump drive oil
Class III leak is evident.
Pump Drive
(WP 0317).
24
500 hours
Spraydown Pump
Replace spraydown pump filter
Class III leak is evident.
Filter Screen
screen (WP 0279).
END OF WORK PACKAGE
0222-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.