TM 5-3895-385-23-2
0222
Table 1. Preventive Maintenance Checks and Services (PMCS) Instructions -- Continued.
ITEM TO BE
ITEM
CHECKED OR
EQUIPMENT NOT
NO.
INTERVAL
SERVICED
PROCEDURE
READY/AVAILABLE IF:
10
100 hour
EMERGENCY
Verify proper operation of
Bituminous Material
STOP Switch
EMERGENCY STOP switch (TM
Paving Machine (BMPM)
5-3895-385-10).
and engine do not shut
down.
11
250 hours
Hydraulic System
a. Remove screed cover
Class III leak is evident.
assembly and engine hood
assembly, and check all
cylinders, and hoses for leaks
b. Replace hydraulic oil charge
Class III leak is evident.
c. Replace hydraulic oil return
Class III leak is evident.
12
250 hours
Fuel System
Remove engine hood assembly,
Class I leak is evident.
and check all fuel hoses and
components for leaks or damage.
13
250 hours
Engine Cooling
Remove engine hood assembly,
Class III leak is evident.
System
and check engine cooling system
hoses and components for leaks
Check and fill engine coolant
system as necessary, and
perform coolant gravity test.
14
250 hours
Engine Air Filter
Service secondary air cleaner
Air cleaner element
damaged.
15
250 hours
Screed Extension
Adjust screed extension upper
Upper Screed
screed slide rail bar adjustment
Slide Rail Bar
Adjustment
16
500 hours
Fuel System
a. Replace spin-on fuel filter (WP
Class I leak is evident.
Class I leak is evident.
0222-3