TM 5-3895-385-10
0015
BOLT-ON SCREED EXTENSION KIT REMOVAL -- CONTINUED.
WARNING
Allow 30 minutes of cool down time before touching machine components. Failure to comply may
cause injury or death to personnel.
CAUTION
Care should be taken when retracting screed extension with bolt-on screed extensions installed.
If screed extensions are retracted too far, the end gates will collide with the auger extensions.
Failure to comply may cause damage to equipment.
NOTE
The Bituminous Material Paving Machine (BMPM) is equipped with screed extensions that
will enable the operator to pave up to a 20-foot (ft) (6.1-meter (m)) width. This requires the
installation of screed extensions and auger extensions.
The procedure for installation and removal of material retaining plate extensions is the same
whether being performed on the left side or right side. Left side shown.
1. Remove wing screw (Figure 1, Item 4) from 4-ft bolt-on extension material retaining plate L or R (Figure 1,
Item 1).
2. Remove 2-ft bolt-on extension material retaining plate L or R (Figure 1, Item 5) from 4-ft bolt-on extension
material retaining plate L or R (Figure 1, Item 1).
3. Install wing screw (Figure 1, Item 4) on 4-ft bolt-on extension material retaining plate L or R (Figure 1, Item 1).
4. Remove wing screw (Figure 1, Item 3) from BMPM (Figure 1, Item 2).
5. Remove 4-ft bolt-on extension material retaining plate L or R (Figure 1, Item 1) from BMPM (Figure 1, Item 2)
with assistance.
6. Install wing screw (Figure 1, Item 3) onto BMPM (Figure 1, Item 2).
0015-3