• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 1. Preventive Maintenance Checks and Services (PMCS) Instructions -- Continued.
Table 1. Preventive Maintenance Checks and Services (PMCS) Instructions -- Continued.

Technical Manual For Bituminous Material Paving Machine (Bmpm) Page Navigation
  209    210    211    212    213  214  215    216    217    218    219  
img
. . .
TM 5-3895-385-10
0013
Table 1. Preventive Maintenance Checks and Services (PMCS) Instructions -- Continued.
ITEM TO BE
CHECKED OR
ITEM
EQUIPMENT NOT
NO.
READY/AVAILABLE IF:
SERVICED
INTERVAL
PROCEDURE
68
After
BMPM
a. Raise the screed fully up,
extend screed locking pins,
extend the screed extensions
fully out, close the cutoffs,
and turn on augers and
conveyors (WP 0006).
CAUTION
Avoid spraying electrical components and rubber tracks with cleaner solution whenever
possible. Failure to comply will result in damage to equipment.
b. Spray all areas of BMPM that
come in contact with material,
except for the tracks, with
spraydown cleaner solution
(WP 0006).
c.
Spray inside of auger chain
housing (WP 0006).
0013-25


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.