TM 5-3895-373-34
A.
REMOVE - Continued.
d.
Remove hex head cap screws (20), lockwashers
(21), and flat washers (22) from three locations
at mounting base of each screed handrail (23).
Discard lockwashers.
e.
Remove hex head cap screw (24), lockwasher
(25), flat washer (26), and ground wires (27, 28,
and 29). Discard lockwasher.
f.
Remove hex head cap screw (24), lockwasher
(25), flat washer (26), and ground wires (30 and
31). Discard lockwasher.
g.
Fully raise and extend extension screeds per TM
53895-373-10. Crib as shown on both ends of
screed. Lower screed onto cribbing per TM 5-
3895-373-10.
NOTE
There are two vibration mounts (32)
located on each end of the left and
right extension steps (33).
h.
Remove hex head cap screws (34), lockwashers
(35), and flat washers (36) from vibration mounts
(32). Discard lockwashers.
i.
Slide extension step (33) into main step (37).
GO TO NEXT PAGE
2-895