TM 5-3895-373-34
C.
INSTALL - Continued.
NOTE
For proper solenoid operation, contact
housing (53) must be positioned with
terminal slots oriented as shown when
inserted in connector body (51).
e.
Pull harness wiring from packing port of
connector body (51) until contact housing (53) is
nearly seated. Press contact housing down to
seat housing in connector body.
f.
Slide packing (54) and packing retainer (55) into
packing port of connector body (51). Slide
packing nut (52) forward. Screw packing nut into
packing port and finger tighten.
g.
Thread screw (50) into connector body (51).
h.
Apply electrical insulating compound to exposed
terminals of mating stack valve electrical coil.
i.
Tighten installed packing nut (52) 3/4 turn
beyond finger tight.
GO TO NEXT PAGE
2-613