TM 5-3895-373-20
11.3.
REPLACE WALKWAYS, SCREED GUARD PLATES, AND SCREED HANDRAIL.
This task covers:
a. Remove
b. Clean
c. Install
INITIAL SETUP
Tools:
Personnel Required:
General mechanics automotive tool kit
Two 62B construction equipment repairers. Second person to
(Item 54, Appendix E)
assist in removal and installation of walkways and screed
Crowbar (Item 11, Appendix E)
handrails.
Torque wrench (Item 68, Appendix E)
Wire scratch brush (Item 6, Appendix E)
References:
TM 5-3895-373-10
Materials/Parts:
TM 5-3895-373-24P
Cleaning cloth (Item 7, Appendix C)
Cleaning solvent (Item 24, Appendix C)
Electrical insulating varnish (Item 32, Appendix C)
Thread locking compound (Item 13, Appendix C)
Thread locking compound (Item 12, Appendix C)
Thread locking compound solvent (Item 25, Appendix C)
Lockwashers
Vibration mounts
GO TO NEXT PAGE
11-13