TM 5-3895-373-20e.Remove and package air cleaner filter element.Reassemble air cleaner.f.Remove cap assembly from intake tube. Sealopen port of intake tube with tape.g.Drain fuel tank. Place fuel tank drain plug inpaving machine toolbox.h.Seal fuel tank cap vent with tape.i.Fill pump drive gearbox to operating level per LO53895-373-12.j.Seal pump drive gearbox breather with tape.k.Fill speed reduction gearbox to operating levelper LO 5-3895-373-12.I.Seal speed reduction gearbox breather withtape.m. Coat exposed surfaces of all hydraulic cylinderpiston rods and machined surfaces of controlconsole guide shaft and screed extension guideshafts with preservative conforming to MIL-C-11796, Class 3. Wrap or cover coated surfaceswith barrier material.n.Disconnect battery cables. Coat battery cableends with preservative compound conforming toMIL-C-11796, Class 3. Wrap battery cable endswith barrier material.o.Remove batteries and store in accordance withlocal procedures.p.Apply fresh lubricating grease to all lubricationfittings per LO 5-3895-373-12.q.Seal pipe elbow protective cap with tape.2.26.PREPARATIONFORSHIPMENT.a.For instructions on preparing the paving machinefor shipment, refer to the Bituminous AsphaltPaving Machine Transportability Report. Thisreport is the proponency of the Military TrafficManagement Command (MTMC), ATTN.:MTTE-TRV, Newport News, Virginia. ContactMTMC or the transportation movement officer atyour installation for a copy of this report or foradditional transportation instructions.b.Refer to paragraph 2.4.2 for identification andlocation of shipping brackets.2-472
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business