TM 5-3895-373-10b.Place left and right feeder control switches (2) tothe up, ON position.c.Turn the left and right auger/conveyor switches(3) to the center, OFF position.d.Open flow gates by moving the left and right flowgate switches (4) to the up, OPEN position.e.Empty hopper wings of all residual pavingmaterial by moving hopper wing switches (5) tothe up, RAISE position.f.Turn left and right auger/conveyor speed controlvalves (6) clockwise to the fully open position.2-102
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business