TM 5-3895-373-10m.When hopper is empty, place auger/conveyorswitches (3) to the center, OFF position.n.Wash down paving machine per paragraph3.3.7.o.Shut down paving machine and remove key fromignition switch per paragraph 2.11.2..2ChockinqthePavingMachine. In an emergencysituation where paving machine spring actuatedhydrostatically released brakes fail to operate, chock thepaving machine according to the following procedures.WARNINGDo not open the screed travel lockvalve if anyone is near or under thescreed. The screed can fall rapidlywhen the screed travel lock valve isopened. The falling screed can causesevere injury or death.a.Turn screed travel lock valve (1)counterclockwise to open.b.Lower screed to the ground by moving screedlift switch (2) to the float position.c.Place tow point movement switch (3) to down,LOWER position and lower screed tow arms toexert more ground pressure on screed.2-104
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business