Figure 5. BMPM Lifting Points.

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  1302    1303    1304    1305    1306  1307
img
. . .
TM 5-3895-385-23-2
0435
BMPM LIFTING POINTS -- CONTINUED
1. The front lifting points (Figure 5, Item 1) are located near the hopper.
2. The rear lifting points (Figure 5, Item 2) are located on the operator platform.
3. The lifting and tie down shipping data plate (Figure 5, Item 3) is located on the left side of the BMPM (TM 5-
3895-385-10).
END OF TASK
FOLLOW-ON TASK
1. Install screed (WP 0224).
2. Install front screed arms (WP 0230).
3. Turn BATTERY DISCONNECT switch to ON (TM 5-3895-385-10).
4. Dispose of hydraulic oil and wiping rags In Accordance With (IAW) local Standard Operating Procedure
(SOP).
END OF TASK
END OF WORK PACKAGE
0435-7/8 blank