Figure 9. Conveyor Chain Adjustment.
TRACK REMOVAL AND INSTALLATION

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  1216    1217    1218    1219    1220  1221  1222    1223    1224    1225    1226  
img
. .
TM 5-3895-385-23-2
0419
Conveyor Chain Adjustment -- Continued.
1. Loosen two jam nuts (Figure 9, Item 1).
2. Turn two adjustment bolts (Figure 9, Item 2) to set tension on chain to approximately 1/4 inch (in) (6.35
millimeter (mm)) of slack (Figure 9, Item 3).
3. Tighten two jam nuts (Figure 9, Item 1).
END OF TASK
FOLLOW-ON TASK
1. Remove lifting device.
2. Install floorboard assembly (WP 0274).
3. Verify proper operation.
4. Dispose of hydraulic oil and wiping rags In Accordance With (IAW) local Standard Operating Procedure
(SOP).
END OF TASK
END OF WORK PACKAGE
0419-15/16 blank