• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TRUCK HITCH REMOVAL AND INSTALLATION - Continued
Figure 1. Truck Hitch Roller -- Removal.

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  1156    1157    1158    1159    1160  1161  1162    1163    1164    1165    1166  
img
. .
TM 5-3895-385-23-2
0410
FIELD MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
TRUCK HITCH ROLLER AND BRACKET ASSEMBLY REMOVAL AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Equipment Conditions
General Mechanics Tool Kit (GMTK) (WP 0440, Vol
Engine off (TM 5-3895-385-10)
3, Item 64)
BATTERY DISCONNECT switch OFF (TM 5-3895-
Stud nut geared wheel wrench (WP 0440, Vol 3,
385-10)
Item 85)
Estimated Time to Complete Task
Materials/Parts
0.5 hr
Lock washer (2) (WP 0439, Vol 3, Item 115)
Personnel Required
91L
TRUCK HITCH ROLLER ASSEMBLY REMOVAL AND INSTALLATION
NOTE
The steps to remove a truck hitch roller assembly are the same for both roller assemblies.
Left side shown.
All truck hitch/roller bracket combinations are the same. Removal and installation steps are the same
for all.
0410-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.