TM 5-3895-385-23-2
FIELD MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
CUTOFF HYDRAULIC CYLINDER REMOVAL, INSPECTION, AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Equipment Conditions
General Mechanics Tool Kit (GMTK) (WP 0440, Vol
Augers lowered fully (TM 5-3895-385-10)
3, Item 64)
Cap and plug set (WP 0440, Vol 3, Item 11)
Estimated Time to Complete Task
Drain pan (WP 0440, Vol 3, Item 15)
3.1 hr
Materials/Parts
Cotter pin (WP 0439, Vol 3, Item 78)
Lock nut (WP 0439, Vol 3, Item 49)
Wiping rag (WP 0439, Vol 3, Item 85)
Personnel Required
91L
CUTOFF HYDRAULIC CYLINDER REMOVAL, INSPECTION, AND INSTALLATION
NOTE
Cutoff hydraulic cylinder removal and installation are the same for both cutoff hydraulic
cylinders. Left side shown.
Some hydraulic oil will leak out of hoses and hydraulic fittings when disconnecting or
connecting components. Have a drain pan and rags in place to capture hydraulic oil.