• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. ECM Connections.
Figure 2. ECM.

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  1084    1085    1086    1087    1088  1089  1090    1091    1092    1093    1094  
img
TM 5-3895-385-23-2
0399
ECM Removal -- Continued.
CAUTION
Tag and label electrical cables prior to removal. Electrical cables must be installed correctly for
proper operation. Failure to comply may cause damage to equipment.
1. Disconnect W1 J3 and W1 J39 (Figure 1, Item 7) from output module ECM (Figure 1, Item 1).
2. Loosen screw (Figure 1, Item 5), and disconnect W1 J1 (Figure 1, Item 6) from screed controller ECM (Figure
1, Item 2).
3. Loosen screw (Figure 1, Item 5), and disconnect W1 J2 (Figure 1, Item 4) from propel controller ECM (Figure
1, Item 3).
0399-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.