• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 31. Main Wiring Harness Fuse Box.
LEFT PEDESTAL WIRING HARNESS REMOVAL AND INSTALLATION

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  930    931    932    933    934  935  936    937    938    939    940  
img
. . .
TM 5-3895-385-23-2
0373
FOLLOW-ON TASK
1. Install cable ties where necessary.
2. Install engine hood assembly (WP 0433).
3. Connect batteries (WP 0357).
4. Verify proper operation.
END OF TASK
END OF WORK PACKAGE
0373-38


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.