• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 27. Main Wiring Harness Screed ECM.
Figure 28. Main Wiring Harness Propel ECM.

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  925    926    927    928    929  930  931    932    933    934    935  
img
TM 5-3895-385-23-2
0373
Main Wiring Harness Installation -- Continued.
29. Connect W1 J19 (Figure 27, Item 5) onto W10 J5 (Figure 27, Item 2).
30. Connect W1 J38 (Figure 27, Item 4) onto W10 J2 (Figure 27, Item 3).
31. Connect W1 J8 (Figure 27, Item 6) onto W10 J1 (Figure 27, Item 1).
32. Connect W1 J1 (Figure 27, Item 11) onto screed controller ECM (Figure 27, Item 8), and tighten screw
(Figure 27, Item 10).
33. Connect W1 J35 (Figure 27, Item 13) onto Y6 P2 (Figure 27, Item 9).
34. Connect W1 J34 (Figure 27, Item 14) onto Y5 P3 (Figure 27, Item 12).
35. Connect W1 J3 (Figure 27, Item 16) onto output module ECM (Figure 27, Item 7).
36. Connect W1 J39 (Figure 27, Item 15) onto output module ECM (Figure 27, Item 7).
37. Connect W1 J5 (Figure 27, Item 18) onto Y10 P1 (Figure 27, Item 17).
38. Route main wiring harness through access panel.
39. Install clamp (Figure 27, Item 21), new lock nut (Figure 27, Item 19), and washer (Figure 27, Item 20) onto
access panel.
0373-33


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.