• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Main Wiring Harness Removal -- Continued.
Figure 8. Main Wiring Harness Engine.

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  903    904    905    906    907  908  909    910    911    912    913  
img
.
TM 5-3895-385-23-2
0373
Main Wiring Harness Removal -- Continued.
Figure 7. Spraydown Bulkhead -- Removal.
36. Remove spraydown hose (Figure 7, Item 1) from fitting and route spraydown hose and main wiring harness
worklight wires through bulkhead grommet (Figure 7, Item 2).
0373-11


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.