• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Floorboard Gusset.
KEY LATCH REMOVAL AND INSTALLATION

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  312    313    314    315    316  317  318    319    320    321    322  
img
. . . .
TM 5-3895-385-23-2
0274
Floorboard Assembly Installation -- Continued.
Figure 7. Wireway Cover Plate.
8. Install wireway cover plate (Figure 7, Item 5), four bolts (Figure 7, Item 2), new lock washers (Figure 7, Item
3), and flat washers (Figure 7, Item 4) onto floorboard assembly (Figure 7, Item 1).
END OF TASK
FOLLOW-ON TASK
1. Remove lifting device.
2. Install electronic control modules (ECM) (WP 0399)
3. Install seat slide assembly (WP 0271).
4. Connect batteries (WP 0357).
5. Verify proper operation.
END OF TASK
END OF WORK PACKAGE
0274-11/12 blank


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.