TM 5-3895-385-23-2
0274
Floorboard Assembly Removal -- Continued.
Figure 2. Floorboard Gusset.
3. Remove two bolts (Figure 2, Item 4), lock washers (Figure 2, Item 5), flat washers (Figure 2, Item 6), strap
(Figure 2, Item 3), and floorboard gusset (Figure 2, Item 2) from Bituminous Material Paving Machine
(BMPM). Discard lock washers.
4. Store floorboard gusset (Figure 2, Item 2) under floorboard assembly (Figure 2, Item 1).