TM 5-3895-385-23-2
0224
Screed Installation -- Continued.
Figure 9. Worklights -- Connect.
12. Connect W20 J2 and W21 J2 (Figure 9, Item 2) to worklight connector (Figure 9, Item 1) on both left and right
worklights, securing worklight cable to BMPM with cable ties as necessary.
END OF TASK
FOLLOW-ON TASK
1. Remove lifting device.
2. Install operator platform upper rear wear plate (WP 0276).
3. Verify proper operation, and check for fluid leaks.
4. Dispose of hydraulic oil and wiping rags In Accordance With (IAW) local Standard Operating Procedure
(SOP).
END OF TASK
END OF WORK PACKAGE