• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 7. Hydraulic Hoses -- Connect.
Figure 9. Worklights -- Connect

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  21    22    23    24    25  26  27    28    29    30    31  
img
.
TM 5-3895-385-23-2
0224
Screed Installation -- Continued.
Figure 8. Screed Electric Heater -- Connect.
10. Connect W11 J2 (Figure 8, Item 2) to W1 J15 (Figure 8, Item 1), securing with cable ties as necessary.
11. Connect W11 J1 (Figure 8, Item 3) to W6 J2 (Figure 8, Item 4), securing with cable ties as necessary.
0224-11


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.