• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 1. Preventive Maintenance Checks and Services (PMCS) Instructions -- Continued.
Table 1. Preventive Maintenance Checks and Services (PMCS) Instructions -- Continued.

Technical Manual For Bituminous Material Paving Machine (Bmpm) Page Navigation
  219    220    221    222    223  224  225    226    227    228    229  
img
.
TM 5-3895-385-10
0013
Table 1. Preventive Maintenance Checks and Services (PMCS) Instructions -- Continued.
ITEM TO BE
CHECKED OR
ITEM
EQUIPMENT NOT
NO.
READY/AVAILABLE IF:
SERVICED
INTERVAL
PROCEDURE
99
After
Sonic Auger
Check sonic auger connectors
Damage that would
Connectors
(Figure 21, Item 2) for damage.
impair operation is
evident and sonic augers
are required for mission.
Figure 22. Left Track Wear.
100
After
Left Track
a. Check rubber track (Figure
Separation of upper ply
22, Item 3) for separation of
from lower ply larger than
upper ply from lower ply.
the width of the track
tread and deep enough to
see the steel belt.
b. Check track for proper
Tread is worn flat with
treading (Figure 22, Item 1).
inner portion of track
(Figure 22, Item 2).
0013-35


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.