TM 5-3895-385-10
0013
Table 1. Preventive Maintenance Checks and Services (PMCS) Instructions -- Continued.
ITEM TO BE
CHECKED OR
ITEM
EQUIPMENT NOT
NO.
READY/AVAILABLE IF:
SERVICED
INTERVAL
PROCEDURE
Figure 20. Left Auger and Cutoff.
94
After
Left Auger and
Check auger (Figure 20, Item 3),
Damage that would
Cutoff
cutoff (Figure 20, Item2), and
impair operation or class
hydraulic cylinder and hoses
III leaks are evident.
(Figure 20 Item 1) for damage or
leaks.