• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 1. Preventive Maintenance Checks and Services (PMCS) Instructions -- Continued.
Table 1. Preventive Maintenance Checks and Services (PMCS) Instructions -- Continued.

Technical Manual For Bituminous Material Paving Machine (Bmpm) Page Navigation
  218    219    220    221    222  223  224    225    226    227    228  
img
. .
TM 5-3895-385-10
0013
Table 1. Preventive Maintenance Checks and Services (PMCS) Instructions -- Continued.
ITEM TO BE
CHECKED OR
ITEM
EQUIPMENT NOT
NO.
READY/AVAILABLE IF:
SERVICED
INTERVAL
PROCEDURE
Figure 21. Left Spraydown and Side Left Plate.
95
After
Left Spraydown
Check spraydown hose, fittings,
Damage that would
Wand and Hose
and reel (Figure 21, Item 3) for
impair operation or frayed
damage.
or cracked hoses are
evident.
96
After
Hydraulic
Visually inspect hydraulic
Damage that would
Manifold
manifold (Figure 21, Item 1) for
impair operation or class
damage or leaks.
III leaks are evident.
97
After
Hydraulic Fluid
Check hydraulic fluid level (Figure
Contaminants in hydraulic
21, Item 4). Fill hydraulic fluid as
fluid detected.
necessary (WP 0019).
98
After
NATO Slave
Visually inspect NATO slave
Damage that would
Receptacle.
receptacle (Figure 21, Item 5) for
impair operation is
damage.
evident.
0013-34


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.