• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 29. Material Crown and Valley.
Figure 31. Screed Control -- Crown Adjust.

Technical Manual For Bituminous Material Paving Machine (Bmpm) Page Navigation
  107    108    109    110    111  112  113    114    115    116    117  
img
.
TM 5-3895-385-10
0006
ADJUST SCREED CROWN AND VALLEY -- CONTINUED.
Figure 30. Screed Crown Top Bar Bolts.
1. Loosen two screed crown top bar bolts (Figure 30, Item 1) on right side of screed finger-tight to allow screed
top bar to slide while adjusting crown.
0006-36


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.