TM 5-3895-385-10
0006
USING SCREED ELECTRIC HEAT BOX -- CONTINUED.
NOTE
The screed s electric heat box will apply heat for approximately 25 minutes after the start heat
button is pressed. During normal operation, the temperature of the material will keep the
screed at a sufficiently high temperature. If more heating is necessary, the start heat button
(Figure 13, Item 2) can be pressed again to start another 25-minute cycle.
The screed electric heat box on indicator will illuminate when the screed is actively being
heated.
4. Press start heat button (Figure 13, Item 2), verify screed electric heat box on indicator (Figure 13, Item 1) is
illuminated, and allow screed to heat for approximately 15 minutes.
5. Move screed electric heat box power toggle switch (Figure 13, Item 3) to the off (down) position when done
using screed electric heat box.
END OF TASK
0006-19