TM 5-3895-373-34
B.
INSTALL - Continued.
d.
Stop track drive when leading end of track chain
assembly (6) is at upper front portion of track
idler roller.
e.
Lift trailing section of track chain assembly (6) to
meet lower front edge of track idler roller.
Wedge cribbing (7) between trailing link and
floor.
f.
Slowly move track drive forward until slack is
removed from bottom half of track chain
assembly (6).
g.
Shut off engine and remove key from ignition per
TM3895-373-10.
h.
Match up leading and trailing ends of track chain
assembly (6).
WARNING
Anti-seize compound can cause eye
damage.
Wear
safety
goggles/glasses when using. Avoid
contact with eyes. If compound
contacts eyes, flush eyes with water
and get immediate medical attention.
i.
Apply anti-seize compound to spacers (5) and
master pin (4).
j.
Install spacers (5) and master pin (4) using
universal tool kit and pin removal tool kit.
k.
Start paving machine and rotate track drive
slowly, in reverse, to free cribbing (7). Refer to
TM 5-3895-37310.
I.
As cribbing is loosened, stop track drive and
remove cribbing (7).
m.
Rotate track drive slowly, in reverse, for track
pad replacement. Refer to TM 5-3895-373-20.
n.
Stop track drive. Shut off engine and remove
key from ignition switch per TM 5-3895-373-10.
GO TO NEXT PAGE
2-563
