i.Place the speed range switch in the down,"tortoise", pave position.j.Place the auger/conveyor switches in up "AUTO"and start moving the paving machine forward bypulling up on control handle releases and movingboth control handles forward an equal amount.k.After traveling approximately 20 ft (6 m), checkmat thickness and adjust the angle of attack ifnecessary.I.If the mat shows streaks at the inside ends ofthe extension screeds, adjust extension screedheight to remove the streaks.m. Adjust auger/conveyor speed with theauger/conveyor speed control valve or adjustflow gate to ensure sufficient asphalt at the endsof the screed. The paving material should riseto one half to three quarters of the augerdiameter.TM 5-3895-373-10n.Steer the paving machine to keep the steeringguide indicator rod aligned with the edge of thepaving reference marker.2-49
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business