APPENDIX P
(j) Screed Adjusting Mechanism and Pull Arms
Ball joint housings on screed adjusting mechanisms and pull arms are equipped with grease fittings to lubricate the
ball joints with Texaco Marfak O lubricant every 8 hours of operation. (See lubrication chart).
(k) Pulleys For Screed Lift Cables
There are two pulleys for each screed lift cable and each has a grease fitting. The fitting of the enclosed pulley is not
in plain sight. All four fittings should be greased once each month.
(1)  Power Unit
The diesel engine that powers the paver must be properly lubricated and maintained to insure the dependable and
smooth performance needed in a paving operation.
An individual instruction manual is provided, carefully outlining intervals of time to lubricate, clean air filter, and
change oil along with other points of preventative maintenance. More frequent replacement or cleaning of air filter will be
required in dusty conditions.