• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Section II. MAINTENANCE: ALLOCATION CHART - Continued
Section II. MAINTENANCE: ALLOCATION CHART - Continued

Maintenance Manual For Paving Machine Bituminous Materiel Crawler Mounted Ded Page Navigation
  485    486    487    488    489  490  491    492    493    494    495  
img
APPENDIX C
Section II. MAINTENANCE ALLOCATION CHART
Paving Machine, Bituminous Material, Crawler, Mtd.
(3)
(4)
(5)
(1)
(6)
(2)
TOOLS
MAINTENANCE CATEGORY
MAINTENANCE
COMPONENT
GROUP
AND
FUNCTION
ASSEMBLY
NUMBER
EQUIP
REMARKS
C
O
F
H
D
Battery Cables
Replace
0.4
Repair
0.5
0613
Screed Wiring
Replace
.5
1,5
Repair
.5
Cross Over Cable
Replace
.2
Repair
.5
Chassis Wiring
Replace
.5
Repair
.5
07
Transmission
1,2
0700
Transmission Assembly
Test
1.0
Service
0.5
Replace
10.0
Repair
20.0
Overhaul
30.0
0705
Shifters
Replace
2.0
1,2
Repair
5.0
0719
Transfer Case
Replace
3.0
Repair
7.0
Overhaul
15.0
0725
Electrical Brake
Replace
3.0
15
Frame & Towing
Attachments
1501
Platforms
Replace
2.0
1,2
Repair
1.0
Drivers Seat
Replace
1.0
Repair
1.5
42
Electrical Equipment
(Not in other groups)
1,2,5
4202
Electrical Controls
Screed Vibrators
Replace
2.0
Vibrator Transformer
Replace
.2
Screed Vibration
Adjusting Controls
Replace
1.0
Repair
2.0
*The subcolumns are as follows:
C--operator/crew
O--organizational
F--direct support
H--general support
D--depot
**Work times are included in DMWR
C-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.