• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
APPENDIX C. MAINTENANCE ALIOCATION CHART - Continued
Section II. MAINTENANCE: ALLOCATION CHART - Continued

Maintenance Manual For Paving Machine Bituminous Materiel Crawler Mounted Ded Page Navigation
  480    481    482    483    484  485  486    487    488    489    490  
img
APPEDIX C
Section II. MAINTENANCE: ALLOCATION CHART
Paving Machine, Bituminous Material, Crawler, Mtd.
(3)
(4)
(5)
(1)
(6)
(2)
TOOLS
MAINTENANCE CATEGORY
MAINTENANCE
COMPONENT
GROUP
AND
FUNCTION
ASSEMBLY
NUMBER
EQUIP
REMARKS
C
O
F
H
D
01
Engine
1,2,3,4
0100
Engine Assembly
Test
2.0
Service
0.1
Replace
16.0
Repair
21.0
Overhaul
48.0
Engine Mounts
Replace
3.0
0101
Cylinder Block
Test
5.0
1,2,3,4
Replace
4.0
Repair
20.0
Cylinder Sleeve
Replace
3.0
Cylinder Head
Replace
4.0
Repair
4.0
Overhaul
8.0
0102
Crankshaft
Replace
5.0
1,2,3,4
Main Bearings
Replace
4.0
Drive Pulley
Replace
2.0
0103
Flywheel
Replace
3.0
1,2
0104
Pistons & Connecting Rods
Replace
3.0
1,2
Repair
2.0
Rings & Bearings
Replace
.5
0105
Rocker Arms
Replace
.5
1,2
Valve Springs
Test
.8
Replace
.3
Valve Exhaust
Adjust
2.0
Replace
1.0
Repair
2.0
Camshaft, Bearings &
Gears
Replace
4.0
0106
Oil Cooler
Service
.2
1,2
Replace
1.0
Oil Pan
Replace
1.5
Repair
1.0
*The subcolumns are as follows:
C--operator/crew
O--organizational
F--direct support
H--general support
D--depot
**Work times are included in DMWR
C-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.