APPENDIX C
Section II. MAINTENANCE ALLOCATION CHART
Paving Machine, Bituminous Material, Crawler, Mtd.
(3)
(4)
(5)
(1)
(6)
(2)
TOOLS
MAINTENANCE CATEGORY
MAINTENANCE
COMPONENT
GROUP
AND
FUNCTION
ASSEMBLY
NUMBER
EQUIP
REMARKS
C
O
F
H
D
06
Electrical System
1,2,5
0601
Test
.1
Replace
.5
Repair
1.5
Generator
Test
.1
Replace
.5
Repair
1.0
Inspect
.1
Drive Pully
Repair
.1
Inspect
.1
Drive Belts
Adjust
.2
Replace
.2
0603
Starting Motor
Test
.1
1,2,5
Replace
.5
Repair
1.5
0607
Instrument Panel
Accessories
Replace
.5
1,5
Replace
.7
0608
Circuit Breakers
Test
.1
1,5
Replace
.3
0609
Head, Tail, & Conveyor
Lights
Replace
.2
1,5
Repair
.4
0610
Flasher
Replace
.2
1,5
Limit Switches
Replace
.2
Screed Lift Switch
Replace
.2
0611
Horn Assembly
Replace
.3
1,5
0612
Batteries Storage
Inspect
0.1
1,5
Test
.3
Replace
0.5
Service
0.2
*The subcolumns are as follows:
C--operator/crew
O--organizational
F--direct support
H--general support
D--depot
**Work times are included in DMWR
C-7