• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Explanation of Columns in the Tools and Test Equipment Requirements
Table 1. Maintenance Allocation Chart (MAC) for the Bituminous Material Paving Machine (BMPM) -- Continued.

Field Maintenance Manual For Bituminous Material Paving Machine - 3 Page Navigation
  1    2    3    4  5  6    7    8    9    10  
img
. .
TM 5-3895-385-23-3
0438
FIELD MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
MAINTENANCE ALLOCATION CHART (MAC)
Table 1. Maintenance Allocation Chart (MAC) for the Bituminous Material Paving Machine (BMPM).
(1)
(2)
(3)
(4)
(5)
(6)
MAINTENANCE LEVEL
GROUP
COMPONENT/
MAINTENANCE
TOOLS AND
REMARKS
NUMBER
ASSEMBLY
FUNCTION
EQUIPMENT
CODE
FIELD
SUSTAINMENT
REFERENCE
CREW
MAINTAINER
BELOW
DEPOT
CODE
DEPOT
C
F
H
D
AAA
Screed
Remove/Install
2.6
1, 2, 19, 20
AAAAA
End Gate
Remove/Install
0.4
1, 2
1, 2
AAAAB
AAAAA
Tilt Screw
Remove/Install
0.2
1, 2
1, 2
AAAAB
AAAAA
Depth Screw
Remove/Install
0.5
1, 2
1, 2
AAAAB
AAAAA
Sonic Mount
Remove/Install
0.2
1, 2
AAAAB
AAAAA
End Gate
Remove/Install
0.3
1, 2
1, 2
Bottom Bar
AAAAB
AAAAC
Screed Arm
Remove/Install
2.5
1, 2
1, 2
AAAAD
AAAAC
Tow Point
Remove/Install
0.2
1, 2
1, 2
Hydraulic
AAAAD
Cylinder
Inspect
0.1
AAAAC
Screed Lift
Remove/Install
11.6
1, 2
1, 2
AZ
Hydraulic
AAAAD
Cylinder
AZ
Inspect
0.1
AAAAE
Flight Screw
Remove/Install
0.6
1, 2
1
Assembly
AAAAF
Walkboard
Remove/Install
0.2
1, 2
Repair
0.1
1, 2
AAAAG
Screed
Remove/Install
4.1
1, 2, 10
1, 2
Extension
AAAAH
Inspect
0.1
0438-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.