Figure 4. Screed Heater Box Bracket -- Installation.
STAIRWAY ASSEMBLY, STAIRWAY WALKBOARD, AND SCREED HEATER BOX BRACKET REMOVAL AND INSTALLATION - Continued

Field Maintenance Manual For Bituminous Material Paving Machine - 2 Page Navigation
  137    138    139    140    141  142  143    144    145    146    147  
img
.
TM 5-3895-385-23-2
0244
Stairway Walkboard Removal
Figure 5. Stairway Walkboard -- Removal/Installation.
NOTE
The top two stairway walkboards are secured with six bolts. The bottom stairway walkboard is
secured with only four bolts.
1. Remove stairway assembly (perform steps 1 3 of Stairway Assembly Removal task).
2. Remove 16 bolts (Figure 5, Item 3) and three walkboards (Figure 5, Item 1) from stairway sides (Figure 4,
Items 2 and 4).
Stairway Walkboard Installation
1. Install 16 bolts (Figure 5, Item 3) and three walkboards (Figure 5, Item 1) onto stairway sides (Figure 4, Items
2 and 4).
2. Install stairway assembly (perform steps 1 3 of Stairway Assembly Installation task).
END OF TASK