• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 1. Lights Relay Fault Troubleshooting Procedures -- Continued
BEACON LIGHT FAILS TO OPERATE

Field Maintenance Manual For Bituminous Material Paving Machine - 1 Page Navigation
  673    674    675    676    677  678  679    680    681    682    683  
img
TM 5-3895-385-23-1
0164
Table 1. Lights Relay Fault Troubleshooting Procedures -- Continued.
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
2. Measure for continuity (WP
1. If continuity is present, proceed
0443, Vol 3) between main
to next malfunction.
wiring harness W1 J1 Pin 41 and
main wiring harness W1 J4 Pin
17 (WP 0451, Vol 3, Figure 3).
2. If no continuity is present,
replace main wiring harness
(WP 0373, Vol 2).
6. Main wiring harness has a short
Measure for continuity (WP 0443,
1. If continuity is present, replace
circuit.
Vol 3) between main wiring harness
main hydraulic manifold wiring
W1 J4 Pin 17 and all other pins on
harness (WP 0373, Vol 2).
the main wiring harness W1 J4 (WP
0451, Vol 3, Figures 1 and 3).
2. If no continuity is present,
replace screed controller module
ECM (WP 0399, Vol 2).
END OF WORK PACKAGE
0164-3/4 blank


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.