TM 5-3895-356-14&P
2. For pump-off close valve at
storage tank soon after pulling butter-
fly valve out.
3. Shut intake valve by moving
lever up.
4. Move quadrant lever to "Circu-
late and Fill" position.
5. Suck back hand spray hose and
gun on pump-off line by turning
Vacu-Flo valve lever to the left posl-
tion. After approximately 1 minute
crack hand spray valve or open pump
off line If through hand spraying for
take Lever down When pumping off
the day, crack hand spray valve with
1. Connect hand spray hose or
check to insure all valves m pump-off
nozzles submerged in flushing oil, use
pump-off hne to transfer valve.
line between distributor and storage
3 quart can supplied.
2. Move transfer valve lever from
tank are open before moving Intake
6. Turn Transfer Valve lever back
"Distribute" to "Hand spray" position
Lever down.
to "Distribute "
(in).
7. Turn hand spray valve 90 degrees
7. Disconnect pumpoff line
3. Run pump at 80 to 100 GPM
on hand spray gun for spraying
8 Turn Vacu-Flo lever straight up
4. For hand spraying move butter-
8. Adjust hand spray pressure with
to normal position
fly valve to "Hand spray" position
butterfly valve Push in lever to m-
9. To blow out hand spray, if de-
For pump-off move butterfly valve to
crease, pull out to decrease
sired after spraying, raise intake valve
"Transfer" position
lever, remove filing cap, open hand
5. Move quadrant lever to "Hand
When through hand spraying or
spraying valve and push butterfly valve
spray" position
pumping off
lever m against stop Add flushing oil
6. Open intake valve by moving In-
1. Pull butterfly valve lever out
If desired.
Figure 73.
Handspraying and Pump- Off
Figure 74.
1. Grommet
No 75A Lead
5. Number 75A Lead
2. Electrical Controls
4. Quick Connector (to Join 6. Main Harness Connector
3. Quick Connector (Attach to
Side Marker Light Leads)
54