TM 5-3895-385-23-3
0438
Table 1. Maintenance Allocation Chart (MAC) for the Bituminous Material Paving Machine (BMPM) --
Continued.
(1)
(2)
(3)
(4)
(5)
(6)
GROUP
COMPONENT/
MAINTENANCE
MAINTENANCE LEVEL
TOOLS AND
REMARKS
NUMBER
ASSEMBLY
FUNCTION
EQUIPMENT
CODE
FIELD
SUSTAINMENT
REFERENCE
CODE
CREW
MAINTAINER
BELOW
DEPOT
DEPOT
C
F
H
D
AAKAJAA
Front Idler
Remove/Install
3.5
1, 2
1
Assembly
AAKAJAA
Forward Roller
Remove/Install
3.3
1, 2
1
Bogie Assembly
AAKAJAA
Middle Roller
Remove/Install
3.5
1, 2
1
Idler Bogie
Assembly
AAKBK
Track Tension
Remove/Install
0.5
1, 2
1
Hydraulic
Cylinder
Inspection
0.1
AAL
Side Left Plate
Remove/Install
2.7
1, 2
AAL
Radiator Cover
Remove/Install
0.1
1, 2
Vent
AAL
Hydraulic Cover
Remove/Install
1.5
1, 2
Vent
AAL
Left Side Cover
Remove/Install
0.5
1, 2
Vent
AAL
Side Right Plate
Remove/Install
0.7
1, 2
AAL
Beacon Light
Remove/Install
0.2
1, 2
Assembly
AAL
Engine Hood
Remove/Install
10.3
1, 2
Assembly
Bolt-On Screed
Repair
1.0
1, 2
1, 2
AAMAT
Extension
AAMAU
Jacking and
Remove/Install
1.0
1, 2
Lifting Points
0438-18