TM 5-3895-385-23-3
0438
Table 1. Maintenance Allocation Chart (MAC) for the Bituminous Material Paving Machine (BMPM) --
Continued.
(1)
(2)
(3)
(4)
(5)
(6)
GROUP
COMPONENT/
MAINTENANCE
MAINTENANCE LEVEL
TOOLS AND
REMARKS
NUMBER
ASSEMBLY
FUNCTION
EQUIPMENT
CODE
FIELD
SUSTAINMENT
REFERENCE
CODE
CREW
MAINTAINER
BELOW
DEPOT
DEPOT
C
F
H
D
AADJN
Screed Raise
Remove/Install
1.1
1, 2
1
and Lower
Hydraulic
AADJN
Screed Vibrator
Remove/Install
0.3
1, 2
Hydraulic
AADJN
Manifold
Remove/Install
1.6
1, 2
1
Assembly
Hydraulic
Solenoid
Test
0.1
1, 2
AADJN
Electric
Remove/Install
1.2
Hydraulic
Test
0.1
1, 2
AAD08
Two Speed
Remove/Install
12.1
1, 2
Hydraulic
AAD08
Brake Hydraulic
Remove/Install
12.8
1, 2
AAD05
Auger Motor
Remove/Install
0.5
1, 2
1
Hydraulic
Solenoid
Hydraulic
Service
1.0
1, 2
Cylinder
AAEAA
Double
Remove/Install
82.8
1, 2
Hydraulic Pump
Drive
AAEAA
Double
Service
10.5
1, 2
Hydraulic Pump
AAEAB
Variable Auger
Remove/Install
81.4
1, 2
Pump
AAEAC
Propulsion
Remove/Install
81.1
1, 2
Pump
0438-9