TM 5-3895-385-23-2
0323
Engine Installation -- Continued.
22. Connect W16 J4 (Figure 18, Item 10) onto W17 J1 (Figure 18, Item 9).
23. Connect yellow wire (Figure 18, Item 7) and install nut (Figure 18, Item 6) onto starter solenoid (Figure 18,
Item 8).
24. Install bolt (Figure 18, Item 1), new lock washer (Figure 18, Item 2), and two ground wires (Figure 18, Items 3
and 4) onto ground weldment (Figure 18, Item 5) on battery-charging alternator.
0323-31