TM 5-3895-385-10
0013
Table 1. Preventive Maintenance Checks and Services (PMCS) Instructions -- Continued.
ITEM TO BE
CHECKED OR
ITEM
EQUIPMENT NOT
NO.
READY/AVAILABLE IF:
SERVICED
INTERVAL
PROCEDURE
Figure 5. Left Auger and Cutoff.
27
Before
Left Auger and
Check auger (Figure 5, Item 3),
Damage that would
Cutoff
cutoff (Figure 5, Item2), and
impair operation or class
hydraulic cylinder and hoses
III leaks are evident.
(Figure 5 Item 1) for damage or
leaks.