TM 5-3895-371-24 & PSection XX. MAINTENANCE OF BITUMETER AIR CONTROL RESERVOIR2-24. Bitumeter Air Control Reservoir.NOTEClose off main air pressure at supply tank and drainoff air pressure by opening drain cock. Refer to TM5-3895-371-10.a.Removal. (Refer to fig. 2-27.)(1)Disconnect two air lines (7) and (8) at elbows (6) and (9).(2)Remove two nuts (11), lockwashers (12), and capscrews (14) from brackets (13).(3)Spread air reservoir brackets (13) and remove air reservoir (1).(4)If air reservoir (1) is to be replaced, transfer all fittings to the new reservoir includingtwo pipe plugs (18) and drain cock (10).LEGEND:1.BUSHING RESERVOIR7.AIR LINE13.BRACKET (2)2.BUSHING8.AIR LINE14.CAPSCREW (2)3.NIPPLE9.ELBOW15.CAPSCREW (2)4.CROSS PIPE10.DRAIN COCK16.LOCKWASHER (2)5.VALVE11.NUT (2)6. ELBOW12. LOCKWASHER (2)17.CAPSCREW (2)18. PIPE PLUG (2)Figure 2-27.Remove/Install Air Control Reservoir.TA 0758332-66
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business