Remove rod (20) from barrel (21).
(9)
Remove lower nut (11); then pull off washers (12), (13), (14), and (15).
(10)
Remove upper nut (16); then pull off cap (17) and spring (18).
(11)
Unscrew handle (19) from rod (20).
(12)
Remove pressure gage (23) from portable burner (8).
C.
(1)
Install pressure gage (23) in portable burner (8).
(2)
Attach handle (19) to rod (20).
(3)
Install spring (18) and cap (17) on rod (20). Secure with upper nut (16).
(4)
Install washers (15), (14), (13), and (12). Secure with lower nut (11).
(5)
Install assembled rod (20) in barrel (21).
(6) Install gasket (22).
(7)
Insert complete air pump assembly into tank and use a twisting motion to fully set it.
(8)
Install nozzle (4) into plug holder (6).
(9)
Install coil (7) in shell (26) and secure with sheetmetal screws (31).
(10)
Close pan (5) and secure to shell (26) with two machine screws and nuts (27).
(17)
Connect shaft of coil (7) through hand grip (29) to valve (28).
(12)
Connect burner hose (24) to valve (28).
d.
Installation. (Refer to fig. 2-53.) Install portable burner in
canister.
Section XXXIII. MAINTENANCE OF SPRAY BAR DISTRIBUTING LINES
2-37. Spray Bar Distributing Lines.
a.
NOTE
Following are procedures for disassembly and re-
agembly of the left side distributing lines and
components. The right side is similar and no
additional detailed procedures are necessary.