TM 5-3895-385-23-2
FIELD MAINTENANCE
BITUMINOUS MATERIAL PAVING MACHINE (BMPM)
FLOORBOARD ASSEMBLY REMOVAL AND INSTALLATION
INITIAL SETUP:
Personnel Required
Tools and Special Tools
91L
General Mechanics Tool Kit (GMTK) (WP 0440, Vol
3, Item 64)
Assistant
Suitable lifting device (128 lb (58 kg) minimum)
Equipment Conditions
Web sling (WP 0440, Vol 3, Item 66)
Materials/Parts
Lock washer (15) (WP 0439, Vol 3, Item 109)
Lock washer (12) (WP 0439, Vol 3, Item 118)
Estimated Time to Complete Task
3.1 hr
0274-1