Figure 6. Screed Extension Kit Panels -- Installation.
PREPARATION FOR STORAGE OR SHIPMENT

Technical Manual For Bituminous Material Paving Machine (Bmpm) Page Navigation
  302    303    304    305    306  307  308    309    310    311    312  
img
TM 5-3895-385-10
0023
UNPACKING BOLT-ON SCREED EXTENSION KIT, CUTOFF SHOES, AND END GATES -- CONTINUED.
WARNING
The top panel weighs 142 lb (64 kg). Four personnel are required to lift component. Failure to
comply may cause injury or death to personnel.
CAUTION
Properly support the item being lifted. Failure to comply may cause damage to equipment.
11. Install top panel (Figure 6, Item 1) into screed extension kit box (Figure 6, Item 4) with assistance.
WARNING
The front panel weighs 55 lb (25 kg). Two personnel are required to lift component. Failure to
comply may cause injury or death to personnel.
CAUTION
Properly support the item being lifted. Failure to comply may cause damage to equipment.
12. Install front panel (Figure 6, Item 7), 13 bolts (Figure 6, Item 6), and flat washers (Figure 6, Item 5) into screed
extension kit box (Figure 6, Item 4) with assistance.
13. Install 22 bolts (Figure 6, Item 2) and flat washers (Figure 6, Item 3) securing top panel (Figure 6, Item 1) to
screed extension kit box (Figure 6, Item 4).
END OF TASK
END OF WORK PACKAGE
0023-14