Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
Table 2-1. Preventive Maintenance Checks and Services for Model 780T Bituminous Asphalt Paving Machine - Continued - TM-5-3895-373-20_82
Table 2-1. Preventive Maintenance Checks and Services for Model 780T Bituminous Asphalt Paving Machine - Continued - TM-5-3895-373-20_84
TM-5-3895-373-20 Bituminous Distributor Body M918 Model D-63 Manual
Page Navigation
71
72
73
74
75
76
77
78
79
80
81
TM 5-3895-373-20
Table 2-1. Preventive Maintenance Checks and Services for
Model 780T Bitnminous Asphalt Paving Machine - Continued
Location
Item
Interval
Procedure
Not Fully Mission
No.
Item to
Capable If:
Check/Service
21
250
Frame weld(s)
Hopper wings fully raised per TM 5-3895-
Rear hopper support welds are
hours/
373-10.
broken or cracked
semi-
annual
Check rear hopper support weld(s) (23) for
breaks or cracks.
2-23
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business