TM 5-3895-373-20Table 2-1. Preventive Maintenance Checks and Services forModel 780T Bituminous Asphalt Paving Machine - ContinuedLocationItemIntervalProcedureNot Fully MissionNo.Item toCapable If:Check/Service950 hours/Conveyor driveCheck both conveyor drive shafts (3) for freeEither drive shaft end movessemi-shaftsplay by grabbing shaft and pulling back andinside the bearingannualforth.NOTEIt may be required to operate the conveyorto move a drag bar from in front of theconveyor shaft. Refer to TM 5-3895-373-10to allow access to the conveyor shaft.2-13