TM 5-3895-371-24 & P(2)Install two assembled solenoid valves (34) and four washers (6).(3) At bottom of air control box (64), install two flat washers (6), adapters (16), nylontubes (24) and (27) with male connectors (25) and (28) and swivel connectors (26) and (29).(4)Connect wires to terminal strip (56). (Refer to fig. 2-18.)(5)Connect nylon tubes (38) and (48) as shown.(6)Install control box cover (59) and secure with sixteen screws (58).(7)Install control knob (47) and secure with nut (45) and washer (46).NOTEFor maintenance of other tubes, fittings, fastenersand wiring within the air control box, use standardshop practices and follow figures 2-16, 2-17, and 2-18.Section XVII. MAINTENANCE AND ROUTING OF AIR LINES2-21. Routing of Air Lines.a.Removal. (Refer to fig. 2-19.)NOTEBleed air reservoirs and tag each hose as removedwith the call out number.(1)Unscrew fittings at either end of hose (2) between air lubricator (1) and solenoid airvalve (3); remove hose (2).(2)Unscrew fitting of hose (5) at connection to gage on air lubricator (1) and unscrew airpressure gage (35).(3)Unscrew fitting of hose (4) at air lubricator (1).(4)Cut nylon ties (6) along top of frame cross angle.(5)Unscrew fitting of hose (5) at 'T' fitting (12) on back of air reservoir (11) located be-hind stowage box; remove hose (5).(6)Unscrew fitting of hose (4) at connection to tubing (9); remove hose (4).(7)Unscrew fitting of hose (8) at connection to air control box (7).(8)Unscrew fitting of hose (8) at connection to tubing (9) and remove hose (8).(9)Unscrew bolt, washer, and nut from three tubing retainers (10); remove tubing (9)from outer LH frame rail.2-50
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business